D.C. Law 26-90 · DC District of Columbia · Section 4

Qualified residential roof projects and mixed-use energy wording

When it was enacted

Enacted 2025-12-19 · Effective 2026-02-12 · Temporary law.

Official record dates

Before

Earlier emergency Act 26-207 already substituted the same rooftop provision and removed the same mixed-use net-zero-compliance phrase. The actual pre-February 12 Green Building Act subsection contains those changes. This temporary enactment repeats them; it does not establish that all roof work was previously exempt or that other energy standards cease to apply.

Earlier official source

After

For qualifying residential projects under the existing Green Building Act subsection, new construction or substantial rehabilitation involving replacement or repair of at least half the roof area must incorporate on-site rooftop renewable-energy systems wherever feasible, subject to listed exceptions. It also removes “maintain net zero energy compliance” from the mixed-use clause, while retaining that clause’s separate green-building standards and other applicable requirements.

Enacted source

In plain English

The existing subsection covers District/instrumentality-owned projects and projects at least fifteen percent District/instrumentality-financed, subject to its other applicability conditions; the residential paragraph requires at least 10,000 square feet of gross floor area. This is not a rule for every private home’s roof repair. The roof threshold measures roof area, while the separately incorporated substantial-rehabilitation definition uses renovation cost compared with pre-rehabilitation assessed value. Exceptions cover inadequate solar access under the cited energy code, essential mechanical/HVAC/other rooftop infrastructure, rooftop amenities, DOB/DOEE-defined structural/shading/design limits preventing effective generation, and other regulatory conditions making installation impracticable. An individual project’s feasibility or exception still needs evaluation. The mixed-use clause retains its LEED-certified-level-or-better requirement and section 6-1451.05 requirements. The nonresidential net-zero clause is not deleted by this section, and the act preserves other environmental standards; this is not repeal of every net-zero rule.

Timing and applicability

The temporary law took effect February 12, 2026 and expires 225 days after taking effect. Actual project scope, applicable financing dates, current codes/rules, feasibility determinations, certification and other or later requirements remain unverified. The separate final-regulation expiration clauses in sections 2 and 3 are not described here as an express extra sunset for section 4.

Explanation reviewed 2026-10-24.

Read the official section text
4 Section 3(a) of the Green Building Act of 2006, effective March 8, 2007 (D.C. Law 16-234; D.C. Official Code § 6-1451.02(a)), is amended as follows: (a) Paragraph (3)(C) is amended to read as follows: (C) In the case of new construction or substantial rehabilitation, as that term is defined in section 103(34) of the Rental Housing Act of 1985, effective July 17, 1985 (D.C. Law 6-10; D.C. Official Code § 42-3501.03(34)) , in which a roof replacement or repair of 50% or more of the roof area is within the scope of the project in accordance with the District of Columbia Building Code (Title 12A of the District of Columbia Municipal Regulations), the developer shall incorporate rooftop renewable energy systems on-site wherever feasible except when: (i) There is not adequate solar access as determined by Chapter 13 of Title 12-I[CE] of the District of Columbia Municipal Regulations; (ii) Mechanical equipment, HVAC systems, or other essential rooftop infrastructure are present; (iii) Rooftop amenities such as pools, decks, or recreational areas exist; (iv) Structural constraints, shading, or design limitations, as defined by DOB or DOEE, prevent effective solar generation; or (v) Other conditions identified in regulations issued by DOB or DOEE that render installation impracticable. . (b) Paragraph (6) is amended by striking the phrase "shall maintain net zero energy compliance and fulfill" and inserting the phrase "shall fulfill" in its place.
Pinned official bulk source

Interpretations & later changes

Later-law and court review may be incomplete. Absence of an entry does not establish that the original provision remains in force.

No separately reviewed later development is published here yet.

Read the complete law guide and review status