D.C. Act 26-275 · Section 2
Section 2 (no heading in source)
Before/After explanation not reviewed yet. The official section text is available below; a legal comparison will be added only after source review.
Enacted 2026-03-06 · Effective 2026-03-06 · Emergency act.
Historical enacted record. Complete current-law and later-development review may be unfinished.
Official section text
2 The Green Building Act of 2006, effective March 8, 2007 (D.C. Law 16-234; D.C. Official Code § 6-1451.01 et seq .), is amended as follows: (a) Section 2 (D.C. Official Code § 6-1451.01) is amended as follows: (1) Paragraph (1) is amended to read as follows: (1) "Addition" shall have the meaning ascribed to it in the Building Codes. . (2) Existing paragraph (2A) is redesignated as paragraph (2B) (3) A new paragraph (2A) is added to read as follows: (2A) "Aquatic center" means a structure intended for swimming or recreational bathing that contains water over 24 inches deep and includes the pool, decks, surrounding structure, locker rooms, electrical and mechanical rooms, and IT controls that support the pool. . (4) A new paragraph (3A) is added to read as follows: (3A) "Building Codes" means the portions of the Construction Codes designated as the Building Code and the Existing Building Code. . (5) Paragraphs (6) and (7) are amended to read as follows: (6) "Construction Codes" shall have the same meaning as in section 2(2) of the Construction Codes Approval and Amendments Act of 1986, effective March 21, 1987 (D.C. Law 6-216; D.C. Official Code § 6-1401(2)). (7) "Construction documents" shall have the meaning ascribed to it in the Building Codes. . (6) Paragraph (8) is repealed. (7) Paragraph (14) is amended to read as follows: (14) "Existing building" shall have the meaning ascribed to it in the Building Codes. . (8) Paragraph (22) is amended to read as follows: (22) "Gross floor area" shall have the meaning ascribed to it in the Building Codes. . (9) A new paragraph (31B) is added to read as follows: (31B) "Level 3 alteration" shall have the meaning ascribed to it in the Building Codes. . (10) A new paragraph (32C) is added to read as follows: (32C) "Natatorium" means a building or complex housing one or more indoor pools featuring HVAC and humidity controls to manage the environment. . (11) Paragraph (40A) is amended to read as follows: (40A) "Temporary building" means a: (A) Trailer; or (B) Structure that is used or intended for supporting or sheltering any use or occupancy on a non-permanent timeframe for an interim use during construction of a permanent structure. . (b) Section 3(a) (D.C. Official Code § 6-1451.02(a)) is amended as follows: (1) The lead-in language of paragraph (1) is amended by striking the phrase "substantial improvement" and inserting the phrase "Level 3 alterations" in its place. (2) Paragraph (2) is amended as follows: (A) Subparagraph (C) is amended by striking the phrase "; and" and inserting a semicolon in its place. (B) Subparagraph (D) is amended to read as follows: (D) Maintain net zero energy compliance unless the project is for the construction of: (i) A temporary building; (ii) An addition less than 10,000 square feet; (iii) A police, fire, emergency response, or Office of Unified Communications facility; provided, that the facility need not comply with energy conservation and obtainment standards otherwise required by section 2(a)(3)(A) and (B) of the Clean Energy DC Building Code Amendment Act of 2022, effective September 21, 2022 (D.C. Law 24-177; D.C. Official Code § 6-1453.01(a)(3)(A) and (B)) ("Clean Energy DC Building Act") , until the effective date of the final regulations issued by the Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Act (D.C. Official Code § 6-1453.01(b)(1)) ; (iv) A natatorium; provided, that the aquatics center in which the natatorium is located need not comply with energy conservation and obtainment standards otherwise required by section 2(a)(3)(A) and (B) of the Clean Energy DC Building Act (D.C. Official Code § 6-1453.01(a)(3)(A) and (B)) , until the effective date of the final regulations issued by the Mayor pursuant to section 2(b)(1) of the Clean Energy DC Building Act (D.C. Official Code § 6-1453.01(b)(1)) ; or (v) A project for which all permits necessary to begin construction were submitted before October 1, 2024, and that was not submitted to GBAC before the effective date of the Net Zero Modification and Preservation Emergency Amendment Act of 2026, passed on emergency basis on February 3, 2026 (Enrolled version of Bill 26-585) ; and . (C) A new subparagraph (E) is added to read as follows: (E) Maintain compliance with section 2(a)(3)(D) of the Clean Energy DC Building Act (D.C. Official Code § 6-1453.01(a)(3)(D)) . . (3) Paragraph (3)(B) is amended by striking the acronym "DCRA" and inserting the acronym "DOB" in its place.