← D.C. Act 26-123 · All reviewed explanations

D.C. Act 26-123 · DC District of Columbia · Section 2

Emergency Heritage Tree exception for specified Parkside lots

When it was enacted

Enacted 2025-08-01 · Effective 2025-08-01 · Emergency act.

Official record dates

Before

The actual pre-August-1 Code required a Heritage Tree removal permit, with mandatory issuance for a hazardous tree or a species identified by regulation and discretionary issuance for qualifying relocation/replanting. A relocated tree dying within three years could violate the section. The section carried a minimum $300-per-inch violation fine, increasable by regulation. It contained no subsection (e) exemption for these specified lots.

Earlier official source

After

Adds subsection (e): this Heritage Tree protection section does not apply to a Heritage Tree located in Lots 865, 866, 867, 868 and 869 in Square 5056 for which the Zoning Commission approved a planned unit development before July 1, 2016, provided that the special-tree-rate fee under section 104 is paid for each Heritage Tree removed from those lots.

Enacted source

In plain English

Both the specified location and the pre-July-1-2016 planned-unit-development approval condition matter. This is not a citywide exemption or a finding that any particular project actually satisfies them. The fee applies per Heritage Tree removed. The checked special-tree statute states an amount not less than $55 for each inch of trunk circumference and permits the Mayor to increase that fee by regulation; the amendment refers to the applicable rate, so $55 is not verified as the actual payable rate for a particular removal. The checked definition measures circumference at 4½ feet above ground and defines a Heritage Tree as at least 100 inches in circumference. The exemption concerns this section, not automatic approval under every zoning, public-space, construction or other tree rule. It does not establish that trees were removed, fees paid, particular permits unnecessary under other law, or actual approval dates. Project/lot facts, regulatory rates, other permits, complete transition and current law remain unreviewed.

Timing and applicability

Recorded effective August 1, 2025. Section 4 limits the emergency act to no longer than 90 days after taking effect. Later temporary Law 26-46 recorded effective October 1, 2025, with its own 225-day term. The July 1, 2016 cutoff qualifies the project approval; it is not this enactment’s effective date or proof of uninterrupted legal operation.

Explanation reviewed 2026-11-01.

Read the official section text
2 Section 104a of the Urban Forest Preservation Act of 2002, effective July 1, 2016 (D.C. Law 21-133; D.C. Official Code § 8-651.04a), is amended by adding a new subsection (e) to read as follows: (e) This section shall not apply to a Heritage Tree located in Lots 865, 866, 867, 868, and 869 in Square 5056 for which the Zoning Commission has approved a planned unit development prior to July 1, 2016; provided, that a fee calculated at the rate applicable for special trees pursuant to section 104 shall be paid for each Heritage Tree removed from the aforesaid lots. .
Pinned official bulk source

Interpretations & later changes

Later-law and court review may be incomplete. Absence of an entry does not establish that the original provision remains in force.

No separately reviewed later development is published here yet.

Read the complete law guide and review status