← D.C. Act 26-117 · All reviewed explanations

D.C. Act 26-117 · DC District of Columbia · Section 2

Streatery program through December 2025 with retained fee and operating conditions

When it was enacted

Enacted 2025-07-21 · Effective 2025-07-21 · Emergency act.

Official record dates

Before

Earlier Act 25-669 section 2 and temporary Law 25-294 section 2 extended the program through July 31, 2025 and already supplied the 2025 fee deadlines. The checked July 20 Code contains that July endpoint, $100 annual fee and class-specific fee exception. This section moves the program wording to December 31; it does not first create the annual fee or September exception.

Earlier official source

After

Replaces the specified 2022/2023 program wording in section 25-113(a)(6) with 2022, 2023, 2024 and through December 31, 2025. Restates the $100 annual fee’s 2025 due date of April 1, except on-premises retailer classes C/T, D/T, C/N or D/N and manufacturer class B, whose 2025 fee is due September 30. The date extension carries forward the existing temporary ground-floor/street-level outdoor-space program and its conditions.

Enacted source

In plain English

Eligible registration categories in the checked underlying provision are on-premises retailer classes C/R, D/R, C/T, D/T, C/H, D/H, C/N, D/N, C/X or D/X, including a multipurpose facility or private club; manufacturer classes A, B or C with an on-site sales and consumption permit; or a Convention Center food and alcohol business. It covers new or expanded temporary outdoor public/private space absent from the existing license, not every business or every outdoor area. Board approval is not required merely to register, but registration, the annual fee, electronic-mail notice to the Office of Advisory Neighborhood Commissions and written ABCA authorization before selling, serving or allowing alcohol consumption are still required. Public-space operation requires prior DDOT registration; private-space use requires the owner’s written approval. Applicable orders, agency rules and permit terms remain. The space must be in a commercial or mixed-use zone, comply with public-space advertising-permit terms, be clearly delineated and not share tables/chairs with another business. Retained settlement-agreement provisions distinguish currently licensed outdoor areas from new/expanded temporary space: specified sidewalk-café/summer-garden restrictions are not to be applied to the newly permitted space or treated as a prohibition on the stated temporary operations; licensed and new areas must be marked distinctly. Parties may waive provisions addressing currently licensed space for no more than 180 days; that is not an automatic erasure of every agreement. The outdoor definition includes ground/street-level sidewalk cafés or summer gardens with awnings or tents having no more than two sides, excludes retractable-glass/other operable-wall enclosures, and excludes temporary unlicensed rooftops and non-ground/street-level summer gardens from this registration route. The retained noncompliance clause permits specified license sanctions and requires registration revocation under its stated conditions. The fee is annual, and the fee deadline differs from the program’s December 31 endpoint. Actual registrations, authorizations, public/private permissions, zoning, settlement agreements, fees, enforcement, individual compliance, complete transition and current law remain unreviewed.

Timing and applicability

Recorded effective July 21, 2025; section 6 gives this emergency act no longer than 90 days from effect. Section 4 separately repeals the earlier Law 25-294; this explanation does not resolve every transition consequence. The measure’s own term does not change the program wording’s December 31, 2025 endpoint into permission through the end of that term or an automatic 2026 renewal. These are historical dates, not current operating instructions.

Explanation reviewed 2026-10-29.

Read the official section text
2 Section 25-113(a)(6) of the District of Columbia Code is amended as follows: (a) Strike the phrase "2022 and 2023" wherever it appears and insert the phrase "2022, 2023, 2024, and through December 31, 2025" in its place. (b) Subparagraph (A)(i)(II) is amended by striking the semicolon and inserting the phrase "annually with the fee for 2025 due by April 1, 2025; except, that an on-premises retailer licensee, class C/T, D/T, C/N, or D/N, or a manufacturer licensee class B, shall pay the fee for 2025 by September 30, 2025;" in its place.
Pinned official bulk source

Interpretations & later changes

Later-law and court review may be incomplete. Absence of an entry does not establish that the original provision remains in force.

2025-12-11 · Later temporary streatery extension text

Law 26-58 repeats December 31 program wording and historical fee dates

Temporary section 2 uses December 31, 2025 for the program and the same April 1/September 30 fee wording; it does not restart those past dates or supply an automatic 2026 renewal.

Scope
Separate 225-day term from recorded effect; section 4 also repeals the named earlier Law 25-294. Actual transition, individual permissions, compliance and complete current law remain unreviewed.
Official source

2025-12-11 · Later temporary cannabis-location restatement

Law 26-58 repeats the distance wording and transition-cohort exception

Temporary section 3 repeats the general/older-category distance wording and the specified unlicensed-establishment application-cohort exception tied to the protected facility’s main entrance on commercially or industrially zoned ground.

Scope
A separate historical version, not a finding that a particular parcel or applicant qualifies, that authority was uninterrupted, or that complete current law is verified.
Official source

Read the complete law guide and review status